Design Studio Group Ltd.(formerly: Design Studio Furniture Manufacturer Ltd)

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
#31
Page 8 of the Q4 FS, there is a 45 million accrued contract costs. Anyone can give guidance how I should interpret that? What assets could be used to offset this costs?

Sent from my CLT-L29 using Tapatalk
Using Tapatalk
Reply


Messages In This Thread
Design Studio Group Ltd.(formerly: Design Studio Furniture Manufacturer Ltd) - by Life is a game - 07-03-2019, 02:02 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)